248.619.7600
Contact Us248.619.7600
Construction on Holes 8 & 9

Some of you may recall the water main break which occurred in early November off South Blvd.  Unfortunately, the 72 inch main was not the only casualty.  The eruption and water flow also eroded our cart path, which surrounds the green on hole #8.  The instability of the area forced us to close holes 8 and 9 throughout the winter, but we do plan on building a temporary cart path soon to open these holes back up.  As soon as the winter frost thaws, and the area settles, we will start work on a temporary path.  Check back for details!